Shop in Need of Our Cutting Concrete Services Builders working in a city centre building found that they needed to install a duct under the concrete floor. They were advised by the project manager that they could not use mechanical breakers on the floor slab as it...
Hydrodemolition in Railway Tunnels You may have watched on BBC TV the nail biting “Ice Getting Thin” documentary on Cross Rail Building, the new £15 Billion Railway in London. Well Hydroblast has had a small but important part to play during the making of...
Road Marking Removal for Runway Airbus A380 Launch brought a Grizzly campaign to the airfield After the product launch of the Airbus A380 , Big Grizzly left his footprints all over the airfield. Hydroblast were contacted by Farnborough Airshow to come and provide...
Using Refractory Removal 90mm of refractory lining, containing stainless steel fibres, needs to be broken out, leaving the steel anchors and steel tube undamaged. How do we do it? Refractory Removal using High Pressure High Volume Water Utilising 700 Horse Power, 1000...
Safe Night Time Line Removal Last week saw us doing some Thermoplastic Road Marking line removal during the night on one of the UK’s busiest airport runways. The Xenon Work lights designed and installed by Hydroblast , make for safe and efficient night time...
Fin Fan Coolers: Condenser Cleaning This week Hydroblast was contacted for our condenser cleaning services. Our task was to use our high pressure cleaning machinery to clean Fin Fan Coolers at a processing plant. Our highly qualified and experienced operators carried...